Update Terakhir : 21 Nov 2018
IPM Kota Tasikmalaya Metode Baru dan Komponennya 2010-2016 |
|
|
|
|
|
|
|
|
|
|
|
|
Komponen |
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
2016 |
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
Angka
Harapan Hidup /AHH (tahun) |
70.73 |
70.81 |
70.87 |
70.93 |
70.96 |
71.26 |
71.37 |
Harapan
Lama Sekolah/HLS (tahun) |
11.85 |
12.24 |
12.66 |
13.11 |
13.36 |
13.37 |
13.40 |
Rata-rata
Lama Sekolah /RLS (tahun) |
8.23 |
8.28 |
8.34 |
8.44 |
8.51 |
8.56 |
8.63 |
Pengeluaran per Kapita Disesuaikan (000 Rp) |
7827.70 |
7908.85 |
8013.43 |
8157.51 |
8210.43 |
8784.81 |
9145.00 |
IPM |
66.58 |
67.18 |
67.84 |
68.63 |
69.04 |
69.99 |
70.58 |
|
|
|
|
|
|
|
|
|